On July 25, 2026, we will conduct a scheduled test of our power supply and emergency power infrastructure at our data center location.
Such regular tests are part of our measures to ensure high operational reliability and resilience. During these tests, we verify under realistic conditions that the redundant power supply systems function as intended. We do not expect any impact on our cloud services. During the test, scheduled switchover operations may take place in the background; however, these will be handled by our redundant infrastructure and will remain transparent to ongoing operations.
As a precaution, we are informing you about this scheduled maintenance, which will take place between 8:00 a.m. and 6:00 p.m.